Rudder pedal cleanup

Not a lot to report tonight. In preparation for rigging the rudder cables, I brought the rudder pedals up from where they’d been sitting for some time. This revealed a couple things that needed addressing – first, the exposed steel of the slide bar had rusted, and second, the assembly in general was pretty dirty. So I ended up just tearing the entire assembly apart for a good cleaning. After getting the rust off the slide bar, I gave it a coat of CLP and then hit it with the heat gun in hopes of getting the stuff to cure a bit. Everything else just got a good wipe-down.

I need to dig out the applicable plans page, double-check all the hardware, and get everything pinned. Most of the bolts here are drilled and use castle nuts, but when I assembled this the first time I decided to wait on the cotter pins. I think now is probably the time to final-assemble this thing. That’ll have to wait until Sunday, though – tomorrow is a busy work-related day, with a fly-out event in the morning and the holiday party in the evening…

Posted in Fuselage | Hours Logged: 1

Rudder control stuff

After an overnight stay in Houston for the FlightAware holiday party, we got back home early this afternoon, and I found a few hours to get a spot of work done. I decided to go ahead and attack stringing the rudder cables, even though I won’t have a rudder to connect them to until my rudder stop comes off backorder and ships (hopefully this week).

Stringing the cables is a fairly straightforward procedure; you feed them in from the rear and just slowly move them forwards. There are two sections of protective plastic tubing around the cables; a short section at the rear avoids chafing where the cables pass through the aft side skins, and a longer section further forward protects where the cables run in close proximity to the rear-seat footwells.

The cables end up passing through essentially every bulkhead from rear to front, and as the cable is threaded through each passthrough, a snap bushing is slid over the cable end and popped into place. Things get interesting, though, when you make it up to the seat floor area. This is where we need to rig that long plastic tube in the footwell area. Here, the cable passthrough is a small detachable piece on each side, which is attached to a seat floor angle with a screw. I’d already riveted the nutplates here, so it was time to do the snap bushing rigging.

We want the plastic tube to be fixed in place, so it gets secured to the snap bushing and the cable guide at its aft end. This is just a matter of cutting a small hole in the tubing, forward of the snap bushing, and threading a zip tie through that hole and the end of the tubing, to secure it to the support.

Here’s the support threaded into place:

And here it is with the zip tie installed. Note that I chose bright orange for really no reason whatsoever:

With that done, I returned to the rudder pedal assembly that I was working on last Friday. I’d mostly reassembled this, save for reattaching the brake pedals, so I got those back in place. I still haven’t installed the cotter pins on these pivot pieces – I thought about doing that today, but decided there’s still no reason to finalize the assembly yet. Then I got the pedals installed on the forward floor.

This was a bit interesting, and where my delaying of riveting the forward bottom skins caught up with me a bit. The pedals attach to two nutplates through the firewall on the forward end, and two nutplates through the floor at the aft end. Well, those aft nutplates aren’t there yet, since they’re riveted as part of the forward lower skin procedure. For now, I just put two bolts through to locate the pedals there, though it occurs to me I can cleco two nutplates in place, and will need to do so to actually test this stuff out. That’ll be another day, though.

From there, I wasn’t quite sure what to do, so I decided it was time to mock up the cockpit a bit more and start evaluating my panel/control layout. Of particular concern was the location I’d chosen for the SDS CPI2 electronic ignition system’s controller. In my mockup, it fits fine on the left panel wing, but in the cockpit, there’s a canopy rail that seemed like it might make access interesting. Also, the forward top skin/glareshield figured in here too, so I dragged that out and clecoed it into place. I also stuck in the throttle quadrant for maximum realism.

It’s really looking airplane-y now:

And then I hopped in and spent a fair amount of time just sort of chair-flying:

And lest anyone thing this was just a chance for me to sit in there and make airplane noises, I was attempting to really evaluate how the cockpit flow would work out, and I’m actually considering making some changes. For one thing, the paper cutouts I have now aren’t quite right. The displays are older Skyview Touch units, whereas I’ll be using newer HDX units. They’re essentially identical in size, though, so this doesn’t really affect the mockup hugely. More notable is that the TSO’d GPS I have is a GTN650; I think I made these before Garmin announced the much more budget-friendly GPS175 earlier this year. The GPS175 has a bit less screen height that the 650, so what I have here is a bit off.

The big remaining question is how I want to lay out my various switches. I’ve already decided that lighting and other similar stuff will go down on the right-side console, and common in-flight switches (that won’t be on the stick grip) I intend to put on the left wing panel, just above the throttle – but that still leaves me with a handful of switches to manage the electrical system. Most of these I’ll only be touching at startup/shutdown, but some will also be emergency-procedure items, ie handling in-flight electrical failures. So there’s the question of location there – I don’t want them in an annoying place no matter what, but I’m not sure how close at hand they need to be. And really, after sitting in here, the panel is so small that I’m not even sure I need to be careful about location – nothing on the panel is going to be hard to reach.

Anyway, I’m leaning towards something like this:

Panel rev2

Its not quite as OCD symmetrical as previous designs, but I don’t think it looks horribly unbalanced or anything, and I like how it moves some of the controls. Shifting the displays right a bit means that the left display (PFD) is a little closer to centerline. I may even run that screen normally split between the flight controls and engine instruments, and have the left one be all map all the time. This also moves the com radio down closer to where my hands will be, and the power distribution switches all end up where they’re easily reachable by my “free” left hand.

One thing that may be smarter would be to swap the intercom and autopilot panels. I like having the intercom panel by the radio, since they’re sort of associated, but the intercom isn’t something I’ll be messing with frequently. The AP panel, though, is way more likely to be used in-flight. Of course, functions for both the AP panel and radio will also be able to be accessed through the touch screens.

Anyway, I could go on about this all night, but I should probably sleep at some point. So I’ll just stop here…

Posted in Fuselage | Hours Logged: 2

Rudder system rigging

Basically what the title says. Tonight I got the rudder pedals rigged up.

Last time, I quit for the night after realizing I needed the rear pedal hardware in place before messing around with the pedals. Here’s a look at what the attach between the aft rudder cables and the short ones attached to the pedals looks like. I put the bolts in here last time just so they’d have somewhere to live:

So I went poking around trying to figure out where I put the rear rudder pedal kit. That’s building in a nutshell, you can spend an amazing amount of time wandering around the shop looking confused. Anyway, once I got the kit and the proper hardware, I got the idler arms installed, and then the cables reattached. Basically, the only difference here is that the connection between the two cables also is in common with the top of an idler arm. The rear pedals are a couple plunger-type pieces that push on the tops of these idler arms.

Here’s the new/correct rigging up here:

With that done, the final step was to attach the forward ends of the cables to their anchor points on the firewall. The basic way the rudder cables function is that the cables pass through S-shaped passages on each pedal. When a pedal pivots, it “wraps” the cable with that S-shaped passage, thus pulling on that cable (or relaxing, depending on direction of movement. At the same time, if the pedals don’t pivot, they can slide forward or back (for adjustment) without pulling the cables. Kind of ingenious, really.

Anyway, at this point the resting position of the pedals are adjusted by moving around washers on the forward cable anchors. The shanks of these pieces are way longer than the holes they go through, and by changing the distribution fo washers between the forward and aft sides of the firewall, the resting position of a pedal can be changed. So the procedure is to clamp the rudder in a neutral position, and mess with the washers until the pedals are vertical. I ended up setting them up with a slight rearward angle, as otherwise they get really close to the firewall at full deflection. I can always tweak this down the road, of course.

With that done, I had a functional rudder system. Which I of course tested by climbing in and actuating the pedals. Which was cool, but I also noticed a sort of chafing noise, which concerned me. I got Josie to come out and look around while I work the pedals, but there seemed to be no single source of the chafing. Some research on VAF seems to indicate that it’s not unusual for the cables to make contact with the snap bushings that line bulkhead passthroughs, but I’m still unsure about the sound. Time to go make a post and ask.

The other thing I noticed while sitting i the cockpit is that the rudder pedal assembly isn’t as secure as I’d like. The forward-aft slide bar is bolted securely in place, but the nylon blocks at the left and right sides, which I thought were supposed to rest on the floor, don’t. Thus the pedal assembly can rock left and right a bit around the slide bar. There’s another thing to ask about…maybe I’ll need to add some spacers down there. On the other hand, if it fits tight against the floor, seems like that would make adjusting the pedals challenging, so I’m kind of unsure here.

But hey…rudders!

20200203 2220183387909137173031696

 

Posted in Empennage, Fuselage | Hours Logged: 1

Systems planning

For the time being, I’m stepping away from the pitot layout stuff, in favor of a more general look at systems. As I alluded to previously, I’m getting to the point where it’d be nice to have some electrical supplies on hand for stuff like extending the pitot heat harness. But if I’m going to order wire, I’d like to go ahead and do it in bulk, so I’m pivoting to working out my avionics layout so I can then at least rough out all the harness routing and then get a materials estimate so I can order a whole bunch of wire and stuff.

So I started actually a couple nights ago with the arts & crafts portion of this program – making mockups out of cardboard for assorted boxes. At first I was just going to sorta mass-produce mockups of everything, but then it became clear that in most cases, I don’t need a full three-dimensional mock; just a flat box with connection locations identified is probably good enough.

In any case, after making flat mocks of both voltage regulators, I moved on to the ADAHRS units. For these, a three-dimensional mock was called for, since vertical clearance will matter, especially for maintenance accessibility. Then, after making these, there was kind of a pause for some documentation reading and plans changing.

Both ADAHRS units connect to the Skyview system using the Skyview network connection. My original plan was to run a single network cable back to the tail, then add a splitter cable to accommodate both ADAHRS units. However, I’ll also have the pitch servo for the autopilot back in this same area, which also accepts a Skyview network connection, albeit with a couple of pins modified. So if I use the splitter, I’ll still have two cables running back here; I could change that by using a Skyview network hub, which allows tying together up to five devices. I got curious as to how much more expensive the hub was than the splitter cable, and discovered…it’s actually cheaper. Huh.

So yeah, I’m going to put a hub back here, and then I can essentially run a single network cable for everything in the tail, and then branch out from the hub. That, in turn, gave me something else to make a mock for (though just a flat piece in this case).

Finally, I wanted to mock up the shelf on which the ADAHRS and the hub will live. Cardboard didn’t seem like it’d cut it here, but I had some thin plywood scrap that would work well. I ended up having to cut it with a hand saw, since my bandsaw kept throwing the blade (seems the lower wheel needs a new tire). But with that done, I could try laying out the units here to see how it fit together.

Here’s the shelf in place. This is just behind the aft baggage bulkhead, which is convenient for maintenance. Accessing these will only require removing that bulkhead, which is just held on with a few screws. (This glosses over the part where I’ll have to be lying inside the fuselage. The word “convenient” is kinda relative here.)

Anyway, with the bulkhead out of the way, I’ll be able to easily get in with a screwdriver to remove a unit for service, and having the hub here will make it easy to add service loops on the network cables. Since the cables attach to the backs of the units, this will allow me to detach a unit, then remove the network cable after pulling it out of the bay a bit. The next photo shows what this looks like from the baggage area, just forward:

I figure the network feed cable from the forward fuselage will come back along the left side somewhere, then climb up the bulkhead to connect to the network hub. From there, another cable will descend back down the bulkhead to the pitch servo. The two cables to the ADAHRS will just have a short run.

On the front of the ADAHRS units, the pitot/static/AOA lines will connect. That’s the one thing I want to think about before I commit to this – what will that plumbing look like? Each of those lines will need to be teed somewhere in this area to connect to both units. These lines will also come from forward on the left side of the fuselage, since the pitot/AOA lines will be coming from the left wing. The static line will probably feed from aft – I need to double-check where the static ports will be located.

Next up will be planning the rest of the aft avionics. Somewhere back here will live the com radio, the remote transponder, the ADS-B receiver, and an ELT. I suppose it’s time to go look at other people’s builds to see what they did for mounting those items. A shelf bridging across the lower longerons seems like a decent approach, but it’s a long span and would need to be pretty well stiffened, especially to mount the ELT.

Decisions, decisions…

Posted in Avionics, Fuselage | Hours Logged: 2

More systems planning

Another day spent figuring out where to put things. Today’s focus was figuring out what to do for an aft avionics shelf, something that was a lot more challenging than it seemed like it ought to be. For whatever reason, I had very little success finding photos of avionics bays in RV-8. I had the idea of putting a shelf just ahead of the elevator bellcrank, just behind the baggage bay, and I found a photo of someone who’d done that, but it just didn’t seem workable to me, at least taking the simple approach of running two pieces of angle laterally between the longerons to serve as the edges of the shelf.

The problem is that doing that only gives a few inches of depth on the shelf, and both the ELT and transponder are much longer. This seemed problematic enough that I tinkered around with several other ideas, most notably putting the shelf just below the ADAHRS shelf, bridging the middle longerons. This location would provide good access through the baggage bulkhead, but it would put those avionics far too close to the ADAHRS units. Since those include magnetometers (read: compasses), they need to be away from basically anything with a power connection.

So putting the avionics here would require either relocating the ADAHRS, or else additionally using a remote mount magnetometer. Any other ADAHRS location would have been hilariously inaccessible, and the remote magnetometer seemed like obnoxious extra work, though I still considered it as a backup plan.

Finally, I came up with an idea to get better shelf space in the original location. Instead of using two pieces of angle oriented perpendicular to the long axis, I could only have the forward angle like this, and at the rear, have two angle pieces…um, angle in…from the aft bulkhead to a point forward of the bellcrank. This allows for a lot more depth where needed for deep items, even if it does look a little weird.

The piece of plywood I used to mock this up actually has the cutout around the bellcrank a fair bit overdone. More realistically, either I’ll have the two angled lines simply meet at the centerline, or else add a short lateral piece at the place where the angles meet the cutout below:

This location provides plenty of depth for the transponder (left) and ELT (right), as long as they’re located outboard. Also shown here is a 2D representation of the ADS-B receiver. This location also provides ample space forward of the units to allow for wiring connections and harness routing. Originally I was going to mount the remote com radio back here as well, but since both the control head and the antenna will be located much further forward, I’m going to prefer putting that behind the panel if possible. If necessary I can still probably fit it back here, too…maybe over beside the transponder.

Next up will be figuring out some kind of avionics shelf behind the panel. I’ve got a couple ideas for that area, none of which I’m super enthused by so far, so that’ll probably end up being another bunch of hours spent puzzling over things. I think I’m also going to go ahead and order a few items that I’ll be finding homes for, since they’re relatively inexpensive – I’m specifically thinking of the fuse blocks I’ll be using behind the panel.

Posted in Avionics, Fuselage | Hours Logged: 4

Even more systems planning

Pretty much the same story as last time. Tonight I made up cardboard mockups of the remaining units I need to plan for, and which I at least sort of intend to put behind the panel. Then I got to looking at the area behind the panel with an eye towards making up an avionics shelf. What makes this interesting i that there are two braces that go across the cabin, tying together the tops of the gear towers. These seem like great starting places for a shelf, except one is higher than the other for some reason.

Still, it seems like people are using these for their shelves; one photo I found simply makes the shelf sort of L-shaped, placed at the level of the lower brace and then having a vertical element to tie into the higher one. I’m tentatively leaning towards just having a sloped shelf going between the braces. I kind of like this better than the L-shape thing, and I think it’ll actually make the stuff back here a little easier to work with for maintenance; I can either remove the EFIS units or the entire panel center section, and then have the shelf stuff presented nicely to me as I sit in the seat.

Anyway, for the time being I cut out a piece of cardboard roughly the size of the shelf and tried laying stuff out on it. Everything seems workable off the bat, though I haven’t carefully accounted for the space needed for connectors. I’ll likely end up with some things mounted against the baggage bulkhead as well, most notably the two voltage regulators (not shown in the following photo).

So none of this is final by any means, particularly since I need to account for those connectors. I guess maybe I should make up cardboard versions of those as well; it feels a little weird but this is definitely something I need to take into account. Mostly now I just get to move stuff around over and over again.

In other news, I’m continuing to accumulate parts. Got some tailwheel stuff coming in tomorrow, just ordered my fuse blocks, and it would appear that the prop governor I ordered via a VAF group buy is about to ship. Oh, and I might have a line on a slightly-used exhaust system for about half the price of a new one. Not super confident that one will work out, though – it’s the Vetterman system I want, but it’s for an IO-360 in an RV-4. Part of me wants to think that the packaging in the cowling can’t be that different, but since Vetterman has different part #s for the two exhausts, clearly there are some differences. But maybe the RV-4 exhaust can be made to work…the savings would certainly be nice.

Posted in Avionics, Fuselage | Hours Logged: 1

Trying to make an avionics shelf

So when I got started nice and early this morning, I decided to go ahead and start fabricating my aft avionics shelf, and I figured I’d start with the most complex part of the thing – the carefully-bent piece of angle to support the sort of wraparound shape of the back of the shelf.

So I cut off a chunk of angle long enough to do the deed, plus some extra because I’m not a complete idiot. Then I used the plywood mockup I had to mark where my bends would be, and cut out notches to allow for those. Those were rough cut on the band saw and then refined with files, and then the bends could be made. It ended up nicely fitting with the template:

Next, I used the template to trim the ends to length, and all I had left to do was to remove one leg of the angle to leave mounting tabs that could bolt to the longerons. And that’s where this went sideways – I set up the trim wrong, and ended up mangling the ends. Welp…learning experiences abound. So I cut off another chunk of angle and started over again. This time I got the mounting tabs done right, and the piece ended up fitting nicely in the fuselage:

Well, except for one thing. I neglected to account for how, where this piece crosses the fuselage centerline, there’s the beginnings of the elevator bellcrank mount, which sticks up enough that the center of the angle contacts it:

I made an attempt to cut a small relief in the angle there for clearance, removing about 3/16” of the 1/4” angle, but it still contact lightly, though it at least sits level now. Still, I’d probably need to make that relief cut twice as deep to ensure no contact, especially under loads in the air. At that point, I’d have removed a lot of the rigidity provided by the angle here, and right at midspan, where I most need that rigidity.

So long story short, I think I’ve got to go back to the drawing board here. What I may end up doing is figuring a way to tie into the nutplates on the baggage ribs, which are there to support a rear battery box, if installed – but mine is going up front. That would at least provide some nice support to the center of the shelf, but making everything line up properly will likely be a challenge.

So yeah, time for some more thinking.

UPDATE: After mulling over this some more, one conclusion I’ve come to is that I am seriously overbuilding this avionics shelf. Basically, my planned structure would consist of aluminum angles to bridge across the fuselage, with sheet rivet to those angles to form the shelf. However, the upper baggage shelf – which will sit right above this location – has no sort of steparate stiffeners whatsoever. It’s just .025” sheet, with a little rigidity provided by way of bent flanges forward and aft.

Van’s doesn’t list a specific max weight for this shelf, but for the sake of comparison, everything I’ll be putting on my avionics shelf is just over three pounds. If I were to end up putting the com radio back here, it’d go up to about 3.75#. I’m sure that baggage shelf can support well over that!

So with this in mind, I’m going to start with rethinking my shelf and just using sheet aluminum with bent edge flanges for lateral support, instead of the complexity of bending angle in fancy ways. I’ve already got an idea how to use this approach to build my strangely-shaped shelf, too. Maybe I’ll give that a try tomorrow.

Posted in Avionics, Fuselage | Hours Logged: 3

Avionics shelf: the next generation

Alright, so here we are looking at v2.0 of this oddly-shaped shelf. Yesterday was kind of a bust overall, but it eventually got me looking at this problem in a different light. Most of the challenge with this shelf is the way the aft portion sort of wraps around the bellcrank area, and trying to work that with aluminum angle wasn’t doing too great. But last night I eventually concluded that using angle was overkill anyway.

So today I started on a new shelf, this time just using aluminum sheet with formed flanges to provide stiffness. This was also the beginning of a new approach to handling the odd shape. Now, I could have done this all as one piece, but it would have been a bit complicated, especially when it came to forming the aft edge. So instead I decided to take a piecemeal approach. To start with, I’d form a small shelf that went straight across the fuselage, and then form two separate “wings” for the angled portion, which I could then rivet onto the main shelf.

I started with the simply part today – the straight “main” shelf. Material was donated by a surplus wing skin, which was damaged years ago during our move from Atlanta. It’s been just sitting around waiting for the day it was given a new purpose. Basically, I cut off one bay of the wing skin to start with, the used my plywood shelf as a template to get the angles right where they’ll meet the longerons, and finally added allowances for a forward and aft flange. Then there was just lots of cutting and filing and fine-tuning and cleaning up edges, before it was finally time to do some forming:

The tooling holes being used to hold the piece on the forming block are in the locations where screws will attach the shelf to the longerons, but just drilled to #30 for now. (I didn’t want to go look up the right drill size for the screw, I’ll figure that out later)

Getting the whole thing cut out and formed was about an hour and a half of work, but the end result fits nicely in the fuselage, just ahead of the bellcrank:

After attending to other stuff in the afternoon, I found a bit of time after dinner to pick up where I left off and get started with the “wings.” The main shelf didn’t really need a dedicated forming block, since the edges were just straight, but the wings are a different matter. The good news is that since they’re mirror images of each other, I only need to make one block.

Here again, the plywood mockup served as a pattern, though I had to make some slight concessions due to the dimensions of scrap wood I had on hand. Basically, I’ll lose about 1/4” off the back of the wings – which should be no big deal. I decided to call it a night once the block was done, before getting into cutting up more sheet. Here’s a look at the block alongside the main shelf, showing where it fits. The main shelf and wings will simply be riveted together through the mating flanges:

Tomorrow: more cutting and hammering…

Posted in Avionics, Fuselage | Hours Logged: 2

Rear avionics shelf done

Yep, finished up this shelf today, for the most part working in half-hour shifts before retreating to the air conditioning. Houston summer has definitely arrived in full force.

After cutting another section off my wing skin to start with, I laid out the cuts. The nice thing about using a dedicated form block like I did in this case is that it can double as a template – just lay it on the sheet and trace around it, and since my flanges are intended to be 3/4”, the same as the block thickness, the flanges can be traced using the edges of the block. Much faster than doing a bunch of careful measuring. I also laid out my tooling holes in the block and pre-drilled them, so I could use the block to drill those in the pieces and ensure that both parts could be attached to the block.

Some time and a bunch go cutting and filing later, I had the sheet pieces ready for forming:

From there, it was just a matter of clecoing the sheet to the form block, clamping it in the vise, and applying some strategic physical violence with a hammer. The only hangup here is that thank to the material’s springback, I can’t quite get a 90° bend with this block. That would require relieving the edges of the block a bit, and then wouldn’t be symmetrical and thus wouldn’t work for these pieces.

One mostly-finished wing piece:

After squaring up the flanges, it was finally time to cleco the assembly together and see how it fit. Seems decent:

After that there was just laying out the drilling the rivet holes, and eventually squeezing rivets to assemble everything. After a test fit in the fuselage, I needed to work on the outside edges a bit to match up to the fuselage taper, but eventually it fit like a glove:

And here it is with the cardboard unit mockups sitting roughly in their planned homes:

I still haven’t determined if the remote com radio will be located here or behind the panel up front. I realized yesterday that when I was mocking up stuff for the forward avionics shelf, I completed forgot about the ECU unit for the SDS CPI2 ignition. Granted, I haven’t gotten anywhere close to having a real layout for that shelf, so it’s not a huge problem, but it is another thing that could make me decide to move the radio aft.

I’m not convinced that’s going to be necessary, though. I have the beginnings of an idea for basically a two-level setup behind the panel, but it’ll require some tinkering to see if it’ll work. The general idea is to have two low-mounted shelves on the right and left, which will be hinged at their outboard ends and can be swung down beneath the panel for access. The fuse blocks could go on the left side, and the CPI2 controller unit on the right. (I want this to be somewhat-easily accessible, since it has some fuses in it that might need service in a pinch)

Above this would be another flat shelf, high enough to clear the units on the hinged shelves below, and that could house all the other units, stuff that can be less easily accessible. Getting to those would require pulling the EFIS units and/or the entire center panel.

My fuse blocks should come in from Stein Air tomorrow, which will help me start to determine whether this idea is feasible or not. Coming up: lots more photos of cardboard and cheap plywood mockups, I suppose…

Posted in Avionics, Fuselage | Hours Logged: 2

Forward systems planning

Well, this is sort of a conglomeration of work from the past few days, though until tonight it was mostly short sessions of standing around and sort of squinting. Tonight, though, I made an actual effort to make something of those squint sessions. As I may have mentioned before, I’m currently considering a sort of two-shelf system behind the panel. The upper shelf would only be accessible by removing the center panel section or EFIS screens, but the lower one will house fuse blocks, and so I want these to be relatively easily accessible on the ground. So I intend to make that shelf hinged somehow, to provide that easy access.

Part of the question was how to do the hinging. My original idea was to have the shelf be separated into two sections, each of which would be hinged at its outboard end, and thus sort of swing down from the middle. I think this idea would maximize use of space, but add significant complexity in wiring. Sp instead I’m so far going with a one-piece shelf that hinges from the forward end. The main detraction here is that when lowered, the shelf can interfere with the gear towers. So when I did some measuring and cut out a cardboard mockup tonight, I had to sort of chamfer the corners a bit to provide clearance with the towers.

But with that actual mockup, I could lay out the components and start to really consider their layout. Basically, what I expect to have living here is the main power distribution hardware and the SDS CPI2 electronic ignition CPU. The CPI2 unit is kind of optional; I’m mainly including it here because it does include a couple built-in fuses, though if those ever blow it’d mean some very abnormal fault had happened upstream. I might end up rethinking this location, since as we’ll see, things are kind of snug.

The power distribution hardware consists of three fuse blocks, one for each bus: main, essential, and battery, plus some extra hardware allowing for emergency measures. Since the electronic ignition means I’ll have an electrically-dependent airplane, I’m paying special attention to redundancy here. The setup here is based on Bob Nuckolls’s design, where an essential bus includes two potential feed paths: a normal one from the main bus, and an alternate one from an always-hot battery bus. Making this work requires a relay to switch that alternate path, and a large diode to prevent the alternate path from back feeding the main bus. (the idea is that the essential bug is used when loads need to be seriously conserved) That relay and diode are the other two items depicted in this first sample layout:

The thing with this setup is that the layout and routing of the wires is actually kind of important. This actually drive the arrangement of the fuse blocks; my initial idea was to putt he smaller battery block on the far right, but routing the wires to the essential bus works better if that block is located far right.

Still, I wanted to better visualize the wiring runs, and instead of drawing on the cardboard – not necessarily great for iteration – I decided to transfer this layout to a whiteboard. (and, now that I look at it, I see that I inadvertently switched the locations of the diode and relay) The colors here represent the two power paths and, by extension, different wiring sizes. Red is the main power distribution from the alternators, and will be sized at 6ga to be able to handle the max possible output from an alternator. Blue is much smaller wire, used for supplying the battery bus from the battery itself, as well as supplying the essential bus. Wire size here will likely be 10ga, assuming I can refine my load planning a bit.

Not depicted here are the outputs from each block, which I’d expect to run along the bottom of the shelf before branching off to their various destinations.

Anyway, I’m still not completely happy with this layout; in particular, I feel like things are potentially cramped for the wiring runs at the top & bottom of the shelf. I’d prefer to make the shelf narrower in this dimension too – making it this wide would require hinging it at the baggage bulkhead, a bit more complex than hinging it at the forward brace. But I don’t think I can spare that space and still make this layout work…so I’m wondering if the thing to do is to let the CPI ECU live somewhere else. Then I could rotate the two large fuse blocks and gain some room here. I suppose I should do some similar planning for the upper shelf to determine if that’s feasible.

Lots and lots to think about…

Posted in Avionics, Electrical, Fuselage | Hours Logged: 1.5