Seat rib assembly riveting

Today, I went straight out to the garage after getting home from work, so I could go ahead and shoot primer on the pieces I cleaned last night. I gave them all a god acetone wipedown before priming since they’d been sitting out all night. Probably overkill (a repetitive theme in this blog), but just for good measure. I then took a break to install some cosmetic stuff on my car, then I retired inside to eat dinner while the primer dried.

After dinner, it was time to start putting stuff together. First up is the rear spar bulkhead, just riveting the carry through bars, the corner gussets, and the rear center seat belt anchor in place:

IMG 5981

Next the forward side seat belt anchors go together:

IMG 5983

And then it’s time to rivet the floor angles to the forward inboard ribs, along with the seat belt anchor assemblies and the little corner angle pieces I made a while back. This is where most of the night went; there are multiple rivet callouts to keep track of, various pieces to get aligned, and plus I accidentally shot a couple rivets without putting a needed piece in assembly, so I took care of my evening rivet drill-out quota right there.

Here’s the left rib assembly in the vise while I’m riveting:

IMG 5986

For my final act of the night, I clecoed the two rib assemblies to the rear spar bulkhead along with the corresponding aft seat ribs. The next task will be to get these guys riveted in place:

IMG 5988

It does occur to me that I need to rivet the aileron trim bits to these ribs as well, but I don’t think there’s any special hurry on that. The trim kit is designed to be installed on a complete aircraft, so I don’t think I really need to stress about getting the stuff riveted before I move forward with the rib assembly. I’ll think it over overnight and probably look at the trim kit instructions before deciding what to do next.

Posted in Fuselage | Hours Logged: 2.5

Seat rib assembly deburring and dimpling

Back at it again tonight. I spent most of the night deburring the edges of all the ribs and stuff. Mostly this consisted of running the bench grinder for about an hour straight, with some work with the vixen file and die grinder thrown in for good measure. Once I got all the edges taken care of, I dimpled all the appropriate spots on the ribs and rear spar bulkhead, then set aside and marked the handful of parts I want to prime. I even went ahead and cleaned and scuffed those parts tonight; I figure I’ll try and shoot primer on them first thing when I get home from work tomorrow night, then I can dimple the skins while the primer dries and maybe even get started riveting.

No pictures tonight; not really a lot to see to be honest.

Posted in Fuselage | Hours Logged: 2

Seat rib assembly deburring

Ah, the drudgery part of building: deburring everything in sight. Tonight I removed all the clecoes I’d installed previously and went to town deburring. First I did the bottom skins; I cleaned the edges, deburred the holes, and then did some strategic rolling of the edges where there will be lap joints down the road. After setting the skins aside, I disassembled the ribs, angles, and so forth from the rear spar bulkhead and went to work on those. I’d hoped to finish all the deburring tonight, but I only got through the rivet holes on all those pieces. Some of the ribs had their edges done previously, but the bulkhead and some of the heavy bar stock pieces are still pretty rough. Guess I’ll pick back up with the edge finishing tomorrow night.

Here’s a photo of a big pile of parts:

IMG 5978

Posted in Fuselage | Hours Logged: 2

Seat rib assembly match drilling

Not a lot of work tonight. My main goal for the evening was to finally go back and watch the 2015 webinar on flying into Oshkosh. The webinar was held the same night I was buying a car, so I couldn’t watch it live. But I did manage to get out and work for a little bit while waiting for Josie to finish up her work. First I just scanned through the completed steps for this subassembly, just to get familiar with where I’d left off – which was just after clecoing all the ribs to the rear spar carry-through and just before match drilling all those ribs. So I started off with that but of match drilling. The only interesting part was on the outboard most ribs; these have two 1/8” rivets and one AN3 bolt through the bulkhead. To hold the ribs in place while I drilled, I needed to insert a bolt through the bolt hole, but the holes in the rib flanges were slightly undersize, so I just had to drill those out. No big deal.

Next up, the two bottom skins get fitted to the bottom of the seat rib assembly. One of the skins has a stiffener angle bent into its inboard edge, but this leave the skin dead flat, whereas it needs to be curved to fit against the bottom of the ribs. Kind of hard to see, but here’s a rib assembly on top of the flat skin:

IMG 5974

The skin is bent by simply fluting that stiffener angle until the skin bend is acceptable. I was kind of surprised how heavily I had to flute here. The instructions say to flute every 1.5”, but in retrospect I wonder if it would have been better to put the flutes closer together and maybe not have to flute so aggressively. But then again, there might be a good reason for the spacing. Might as well just follow the instructions.

Next I flipped the seat rib assembly upside down and clecoed the bottom skins in place, then match drilled all the holes:

IMG 5976

And that’s where I left off tonight. Next I get to pull all this apart and do the whole deburring dance, but I think all this stuff will be going back together permanently in the relatively near future.

Posted in Fuselage | Hours Logged: 1

Center section finished

Whew…that was a good day’s work for sure. Started off this morning by cleaning and priming all the associated center section parts. That was a little bit tough…when I started cleaning the parts, it was bright and sunny. Halfway through, a random rain shower arrived. Fortunately, it didn’t last long, and soon I was able to finish cleaning the parts. Then another rain shower arrived. It was pretty obvious that leaving the parts outside to dry was unlikely to be successful, so I brought them in the garage. So drying took longer than usual, and then I had to shoot primer inside the garage with the door open, as the sporadic rain kept on coming. Finally I was able to close the door and get the air conditioner going.

After a break for lunch, the garage was cooler and I started riveting. The forward bulkhead assembly is simple, consisting of just three pieces. Didn’t take long at all:

IMG 5956

The rear bulkhead was more fun. For one thing, there are more components; here we also have the seat ramps and floor support angles, and then there’s my doubler repair just to make it more fun. It took quite a bit longer to get this together, working out all the different requires rivet lengths and such.

Here’s the completed doubler repair; it rivets partially in assembly with the floor support angle. Forward side:

IMG 5958

And the aft side:

IMG 5959

And the completed aft bulkhead assembly:

IMG 5961

Next up, I needed to fabricate spacers to simulate the wing spars. These are used to ensure proper spacing between the center section bulkheads during assembly. To be honest, I’m not sure these are needed for the prepunched kit. Some VAF research indicated that others felt that the spacers were a holdover from the non-prepunched kits. That same research also indicated that no one had actually tried building without the spacers. I guess no one wants to go to fit the wings after 1500 hours of work and find out they don’t fit. That’s pretty much the camp I found myself in.

I fabricated the spacers mainly out of some poplar pieces from Home Depot, with space in between to add washers and shims to get the thickness just right. Here’s one half of a spacer assembly with the shims in place:

IMG 5963

And with the second spacer half in place:

IMG 5965

And now the two bulkheads get assembled around the spacers. I initially used hardware store bolts with the threads ground off as locating pins (shown above), then replaced each pin with the proper NAS close-tolerance bolt once everything was together. Then I match drilled the common holes between the top flanges of the two bulkhead halves, pulled the halves apart to deburr and countersink the holes, then put it all back together yet again. As commanded by the instructions, this time I also bolted the seat belt lug, spacers, and control mount in place. This came back to haunt me once I started riveting the two halves together, because those bolts are in the way of squeezing the two inboard most rivets:

IMG 5966

So I got to remove those bolts (which I had just torqued about ten minutes prior), squeeze the rivets, and then put them back. Not too bad, but mildly annoying.

Anyway, that completes the center section assembly! On the bench:

IMG 5970

Clecoed to the forward floor assembly for safekeeping:

IMG 5972

And now it’s back to work on the seat rib assembly. Tomorrow, that is. For now, I’m tired and hungry.

Posted in Fuselage | Hours Logged: 7

Center section repair and prep work

Started off this afternoon by continuing work on my center section doubler. I pulled the doubler off and used the unibit to enlarge the rudder cable passthrough hole to full size, then did the same on the center section web (the correct hole this time). Interestingly enough, when I clecoed the doubler back in place, I found that the two holes were slightly misaligned:

IMG 5950

But no biggie. I marked the overlap on the center section web and filed the hole out a bit until it matched up correctly. Next I removed the doubler again, laid out my rivet lines along the edges, drilled the holes, then clecoed it back in place and drilled the center section web to match the rivet holes:

IMG 5952

And here’s a look at the center section web with the doubler removed. There’s roughly 5/32” of material remaining between the two enlarged holes:

IMG 5954

With the doubler done, I moved on to general center section work. It took a few minutes to catch up on where I left off before. I’d finished match drilling the forward bulkheads, so tonight I did the same for the aft bulkheads. The assembly here is slight more complex due to the seat ramp supports and floor support angles, which rivet to the rear bulkhead. There are also two large vertical bars with 1/4” bolt holes that get drilled in assembly. So the evening was just a bunch of match drilling, countersinking nutplate rivet holes, deburring everything in sight, etc. At the end of the night I had a nice pile of parts ready for primer tomorrow.

Well, hopefully, that is, if the weather cooperates. I’d also like to make a Home Depot run for plywood for my work platform, but again, that kind of requires good weather. We shall see…

Posted in Fuselage | Hours Logged: 3.5

Forward structure finished, moving on to center section

First order of business tonight was to get the firewall riveted to the forward floor. To start with, I cleaned and scuffed the mating area between the two pieces where I was going to apply fire barrier sealant. The prepping was probably overkill, but I figure it can’t hurt. NextI put down a strip of masking tape to help with cleanup later, then laid down a bead of sealant across the mating area. Note that this only covers part of the firewall’s width, specifically the area where the cooling ramp recess is located:

IMG 5936

Then I slid the firewall in place and clecoed it, making sure to put a cleco in every hole where there was sealant. These holes won’t be riveted until much later, so I’ll depend on the cloches to pull everything together tightly while the sealant cures:

IMG 5937

And finally I smoothed the squeezed-out sealant into a nice bead and removed the tape. There’s a bit of a gap in the fillet in the background of the photo, but the seal should still be OK. I’ll probably end up sealing this joint on the forward side just for extra security:

IMG 5940

Next, I worked on shooting the outboard rivets between the forward floor and firewall. These were kind of fun, because the firewall makes for somewhat awkward access for riveting. I eventually turned the entire assembly on end, with the firewall down. That made it much easier to shoot the rivets. The main issue here is that there’s no real structure between the top of the firewall and the baggage bulkhead. The baggage side piece keeps everything more or less in lien here, but there was one rivet where I needed to remove the baggage side for access. So I ended up using scrap wood to support the structure while the baggage side was out:

IMG 5943

That completes assembly work on the forward structure for now. Time to set it out of the way so I can work on other things. I’d been thinking about how to handle a platform to build the fuse on, and what I settled on trying was using my three good sawhorses, with a chunk of scrap MDF for a makeshift tabletop. Well, that was a decent idea, but that scrap MDF is way too short to be useful here. I need something more like a 8’x30” piece or something. I guess another Home Depot trip is in my future; the current makeshift platform barely accommodates the forward structure. There’s not even enough room to work with the seat rib assembly on this thing:

IMG 5945

Before quitting for the night, I tinkered with the center section a bit. Van’s support OK’d my proposed doubler to reinforce where I enlarged the wrong rudder cable passthrough hole, so I started working on that doubler. I cut a way oversize piece of .040” sheet and drilled the first batch of holes in assembly with the center section web:

IMG 5947

Next I’ll enlarge the proper hole for the cable passthrough in both the web and the doubler, then once that’s done I can work out the rivet locations around the perimeter of the doubler and ensure edge distance around the existing holes and so forth. Should be able to get this doubler finished up tomorrow night, I think…though my brother is coming to stay the night, so I’m sure it’ll be a short night in the garage, if I even get out there.

I should probably hash out the work platform this weekend, cause it seems like things are going to start going together fairly quickly here…

Posted in Fuselage | Hours Logged: 1.5

Preparing for firewall riveting

Started out tonight by back riveting the stiffeners to the forward baggage floor; simple stuff there. Next I riveted the mounting bracket (don’t ask me hat it mounts, I don’t know) to the lower baggage bulkhead, then both bulkheads were clecoed in place to the forward upper brace, followed by the baggage side. Next, I clecoed the firewall to the forward floor and the baggage side and match drilled the holes between the floor and lower firewall angle.

Access to these holes was tight from above, so I decided to work from below. This seemed like the easiest way to do it, though it looks kind of odd:

IMG 5932

Next the firewall was unclecoed and all the holes deburred. Some of the inner holes – which will be in the cooling ramp area – get flush rivets here, so the lower firewall angle gets machine countersunk and the forward floor holes dimpled.

The next step would be to rivet the firewall to the lower floor, but I need to seal that joint before riveting. I ordered the fire barrier sealant from Spruce a couple days ago and it should be here tomorrow, then I can proceed. I could have switched back to working on the center section, but it seemed easier to not have to rearrange everything…

Posted in Fuselage | Hours Logged: 1

Finished gear tower assembly

Yup, finally back to work again. The search for a replacement car continues, mainly because I’m looking for something very specific. I did get in some flight time Saturday morning before going to look at a couple cars, then I just got lazy the rest of the afternoon.

Today I started off by cleaning and prepping the baggage bulkheads; I wanted to get those primed this weekend since the weather was nice. Once that was done, I clecoed the gear towers in place (again) on the forward floor and shot the rivets on the aft attach angles. The forward angles remain unriveted until much later, for reasons that I’m sure will eventually be clear.

Look! Rivets!

IMG 5928

Next I clecoed and match-drilled the two upper braces, the mid-cabin braces, and the throttle quadrant mount bracket. I spent a fair amount of time deciding which of these components I was going to prime. In general, my approach to priming interior parts is restricted to parts that I expect to eventually topcoat. So after poking around a bit, I decided that the upper braces didn’t need primer, but the mid-cabin braces did. So I scrubbed and primed those as well. One benefit of the Houston heat is that primer coats dry in no time…

Meanwhile, after deburring the upper braces, I clecoed those into place and riveted them, then put bolts through the appropriate holes. There are some washers here that have to be radiuses a bit to fit inside the tower, so I did that as well and then primed the washers in accordance with the construction manual. By this time the mid-cabin braces were dry, so I brought those in and riveted/bolted them in place as well.

That completes this particular subassembly; time to set it aside and work on the baggage area again:

IMG 5930

I didn’t get a lot done with the baggage area stuff, just riveted all the nutplates to various components and made sure everything was dimpled. I wanted to go ahead and rivet the stiffeners to the floor, but I was getting pretty hungry for dinner by this point, so I called it a night.

Posted in Fuselage | Hours Logged: 4

Gear tower riveting and other stuff

Started out tonight by finally finishing up riveting the outboard weldments to the gear tower. I got in my -5 rivets from Spruce last week, which was what I was waiting on for this task. I shot the -5 rivet (surprisingly not tough at all), then shot the remainder of the -4 rivets on the tower. So there’s one odd-sized rivet here, but hey, it’ll be on the front side of the tower, and the only way anyone will ever see it is if they’re lying on the floor with their head by the rudder pedals:

IMG 5920

The next step is to rivet the towers to the forward floor, but here I got in an argument with myself about priming/painting. Part of me had considered painting the towers before riveting them to the floor, but I’m not sure I’ve settled on what paint I want to use yet. I definitely wanted something for the floor inside the gear towers, so I wanted to at least prime that area. I was not, however, prepared to prime the entire floor, if for no other reason than it would end up scratched up by the time I was done anyway. Eventually I settled on the solution of masking the area around the towers and just spot priming the area under the towers:

IMG 5921

I also checked and retorqued all the bolts between the towers and weldments. The outboard weldments got torque seal on the nuts; even if I removed the bolts, the weldments wouldn’t come out anyway. I didn’t torque seal the inboard weldment nuts though; my rough plan is to remove those when it comes time to paint the gear towers, just so I’m better able to scuff and clean the powder coat. Here’s some torque seal…exciting stuff, huh?

IMG 5926

So tomorrow I should be able to rivet the towers to the floor, and then move on with further assembly work.

Posted in Fuselage | Hours Logged: 1.5