-
Hobbs
1953 hours logged overall Categories
Author Archives: pclifton
Interior painting, plans stand thingy
So I’m only logging this as an hour and a half on the build, but there’s a fair bit more time covered here, over the course of the last thee days. Most of this was addressing what’s been sort of … Continue reading
Seat floors done (structurally, at least)
No photos tonight, it was just sort of menial work. I riveted the rear seatback hinge half in place, in assembly with the appropriate stiffener. Then there were four nutplates on each seat floor that needed to be riveted – … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Riveted seat floor stiffeners
Not much to report tonight. I gave the seat floors a good cleaning and back riveted all but one of the stiffeners in place. The one I left iff gets riveted in assembly with the rear setback hinge – that’ll … Continue reading
Posted in Fuselage
Hours Logged: 1
Seat floors ready to be riveted
I did it! Two days in a row of getting up and getting an early start out in the hangar. I started carrying my 6 AM weekday alarm into the weekends about a month ago, but until now I’ve just … Continue reading
Posted in Fuselage
Hours Logged: 3.5
Some nutplates
Bit more progress today. A lot of the day was taken up with the monthly local RV people lunch, along with some other home-project stuff, but I got up early enough this morning to get some work in, and then … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Assorted seat floor-related stuff
Back at it again tonight. To start with, I took a look at the construction manual and confirmed I was basically done with the throttle quadrant section. The only remaining steps here are to prime and paint the throttle quadrant … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Seriously? More throttle quadrant stuff?
Yes, really. Just one minor detail though. Through all the fitting of the new three-lever quadrant, the one thing still left to do was to replace the pivot bolt with a longer one. Since I added a spacer to tweak … Continue reading
Posted in Fuselage
Hours Logged: .5
Throttle cover plate filler wrap-up
So technically, this work session tool place over two days. I started working on this stuff last night and got about half an hour in before a certain dog decided to eat a large piece of rope and we had … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Throttle cover plate gap filler thingy
So, as mentioned last time, I decided to fab up a spacer to fill the unsightly gap between the throttle quadrant and the cover plate. Last time I said I was working a Spruce order, well, I actually ended up … Continue reading
Posted in Fuselage
Hours Logged: 2.5
OK fine, some more throttle tinkering
Had a little time tonight, so I went out and did some thinking about dealing with that unsightly gap on the forward throttle quadrant. I posted about my problem on VAF but I’ve gotten no responses, so I dunno if … Continue reading
Posted in Fuselage
Hours Logged: 1