-
Hobbs
1953 hours logged overall Categories
Author Archives: pclifton
Finished the riveting and other bottom skin stuff; back to panel things
And after removing the tape: Next up was getting back to panel stuff. While I did the major part of the cutting a while back, for the main panel, there were still the two panel wings that need attention. … Continue reading
Screw replacement plus an eviction
Side note: some folks may notice the two small empty holes on the right side of this photo. Those are intentionally left open; later on that’s how the forward attach point for the fuel tank will be screwed in place. … Continue reading
Posted in Fuselage
Hours Logged: 2
Fuselage riveting redux
So yeah, I sorta goofed off most of yesterday, then most of today was assorted housework – it was a great day to work outside. But ever since I got the new gussets clecoed into place, I’d been eyeing the … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Replacement gusset prep
Well, here we are after another break. Waiting on parts from Van’s blended into the lovely Texas Icepocalypse, which left us without power for three days and with some plumbing repairs afterwards. So it’s been an interesting few weeks there. … Continue reading
Posted in Fuselage
Hours Logged: 1
More riveting, but with setbacks
I came into this evening’s work thinking we were on the home stretch. Maybe 40 or 50 rivets left to go, possibly doable in one session, or worst case surely doable over the course of this weekend, even allowing for … Continue reading
Posted in Fuselage
Hours Logged: 1.5
Even more fuselage riveting
Short session after dinner tonight; we re-shot a few rivets on the forward spar carrythrough flange that had to be drilled out last time, then shot more flush rivets along the bottom of the forward side skins. That just leaves … Continue reading
Posted in Fuselage
Hours Logged: 1