Tonight I just caught the left tower up to where I got the right tower on Sunday; cutting the face into three sections, fitting and drilling the doublers, then finally clecoing everything together and getting everything match drilled.
The whole thing clecoed together:
Detail of the upper doubler (the photo isn’t crooked, there’s a slight angle to the cut here):