Left gear tower modification and match drilling

Tonight I just caught the left tower up to where I got the right tower on Sunday; cutting the face into three sections, fitting and drilling the doublers, then finally clecoing everything together and getting everything match drilled.

The whole thing clecoed together:

IMG 5783

Detail of the upper doubler (the photo isn’t crooked, there’s a slight angle to the cut here):

IMG 5784

Posted in Fuselage. Bookmark the permalink. Hours Logged: 1.5